Decarbonisation at our sites

The diagrams below show how, where and when we estimate each element of our decarbonisation plans could be installed at each of our facilities. They show:

  1. Target dates for commercial operation of carbon capture technology. The dates ranges provided represent the optimistic and pessimistic ends of the scenarios we modelled.
  2. Heat offtake capacity and target dates represent our base case scenario.
  3. Locations and options for private wire networks, electrolytic hydrogen production plants, and transport and storage of the captured CO2.








Aerial view of the enfinium Kemsley facility

Our facilities

We are proud that all four of our facilities rank within the top ten operational energy from waste facilities in the UK, for overall net carbon benefit for every tonne of waste processed.