enfinium announces plans for up to £800m investment in carbon capture project

December 11, 2023 | Facility Update, News Releases
  • Operational from 2030, every year the site will remove over 600,000 tonnes of carbon dioxide from the atmosphere and generate over 90 MW of baseload, homegrown carbon negative power
  • Installing carbon capture on energy from waste plants is vital to decarbonise the millions of tonnes of unrecyclable waste that the UK will continue to produce in the coming decades

WEST YORKSHIRE – Today enfinium, a leading British energy from waste operator, announces its ambition to lead an investment of up to £800 million over the project lifecycle in carbon capture and storage (CCS) technology at one of its UK sites in West Yorkshire. With plans to be operational from 2030, the project would provide the UK with vital carbon removals, decarbonise unrecyclable waste and generate over 90 MW of baseload, homegrown carbon negative power.

The technology will be installed at enfinium’s Ferrybridge 1 and 2 facility in Knottingley, West Yorkshire. Once operational, it would capture around 1.2 million tonnes of carbon dioxide (CO2) every year, including over 600,000 tonnes of durable, high-quality carbon removals – equivalent to taking the carbon emissions of every household in Manchester out of the atmosphere.

The Climate Change Committee’s Carbon Budgets make clear that the UK needs to deliver carbon removals to achieve a Net Zero economy.1 Around 50% of the unrecyclable waste produced by society is made up of biogenic content including organic material such as waste food, plants and paper, which has already naturally absorbed CO2 from the atmosphere. Installing CCS technology at an energy from waste facility enables this CO2 to be permanently captured and stored rather than released back into the atmosphere, resulting in a net carbon removal from the atmosphere or ‘negative emissions’.2

With CCS installed, Ferrybridge, the UK’s largest energy from waste site, would become one of the largest carbon removal projects in Europe, accelerate regional decarbonisation in West Yorkshire and support over 200 jobs across the supply chain during the development phase.

Despite progress in reducing waste and increasing recycling, the UK will continue to produce around 17 million tonnes of unrecyclable waste by 2042. enfinium’s Ferrybridge site currently diverts up to 1.45 million tonnes of unrecyclable waste from climate damaging landfill. As recognised by the UK’s National Infrastructure Commission, emissions from energy from waste plants are lower per tonne of waste compared to landfill.3

The proposals will be put forward for grant support from the UK Government as part of their expansion of the Track-1 cluster sequencing process, due to launch this month. Planning and consenting for the site will move forward in 2024.

This is the first step in enfinium’s decarbonisation journey and it will continue to review opportunities to deploy CCS at other facilities across its portfolio.

Mike Maudsley, CEO of enfinium, said:

To deliver a net zero carbon economy, the UK needs to find a way to produce carbon removals, or negative emissions, at scale. Installing carbon capture at our Ferrybridge site would make it one of Europe’s biggest carbon removal projects. All this while decarbonising unrecyclable waste, diverting it from climate-damaging landfill, and supporting the green economy in West Yorkshire and the wider community.

Tracy Brabin, Mayor of West Yorkshire, said:

“This game changing investment in Ferrybridge will support hundreds of jobs and help us deliver on our ambition of a net zero carbon West Yorkshire by 2028. The work of partners like Enfinium in pioneering green technologies like carbon capture will play a vital role in helping us build a greener, more vibrant region that works for all.”

Olivia Powis, UK Director of the Carbon Capture and Storage Association, commented:

“enfinium’s planned £800 million investment in CCS at Ferrybridge marks a critical milestone for carbon removal and clean power. For the UK to host one of Europe’s largest carbon removal projects, it demonstrates we are really leading the way in our journey towards a net zero future. enfinium’s strategic vision has the potential to sustain and create good local jobs and transform the facility in West Yorkshire.”

ENDS

Notes to editor

Statistical information

1 Climate Change Committee, “Sixth Carbon Budget”, 2020, p. 197.

2 The Intergovernmental Panel on Climate Change states that biogenic matter (of which half of their feedstock is) is carbon neutral at the point of combustion and therefore if you capture that carbon at source it becomes negative. The CCS technology will capture and permanently store underground carbon dioxide that was taken from the atmosphere as the biogenic material grew.

3 National Infrastructure Commission, “The Second National Infrastructure Assessment”, 2023, p. 129.

About enfinium

enfinium is a leading UK energy from waste operator with four operational sites in the UK, in West Yorkshire, Kent and Flintshire, and two in construction. enfinium diverts 2.3 million tonnes of unrecyclable waste from climate-damaging landfill, putting it to good use by turning it into home grown energy, enough to power 500,000 UK homes. enfinium’s ambition is to transform its facilities into local ‘decarbonisation hubs’ powered by the millions of tonnes of unrecyclable waste the UK will produce for decades to come. Using existing energy from waste infrastructure, enfinium could contribute to heat networks, produce electrolytic hydrogen, or use carbon capture technology to provide durable, high quality carbon removals which will be critical for the UK to achieve net zero by 2050. For more on enfinium, please visit www.enfinium.co.uk.

Share This